Ashcrete has supplied prestressed concrete beams as part of its construction of a bridge over the Secher Creek, passing through the northern Negev Mountains area and the western Negev Plains.

75meters

Length of bridge

100tonnes

Weight of beam

1.8maters

Height of beam

Sachar Stream bridge
Sachar Stream bridge

Production of Concrete Beams for a Bridge  

The bridge over Secher Creek was erected for the Neot Hovav Local Council; it is 75 metres long and 10 metres wide. 

Ashcrete manufactured the beams pretensioned and the beam ends with stepped brackets. The beams are up to 35 m. long and reach a height of up to 1.8 m.; each one weighs about 100 tonnes. To build the bridge 3 spans were formed, two of them 20 metres long and a central span 35 metres long. The bridging work involving the spans posed a serious engineering challenge for the field crews.